A 42 Ml/d municipal drinking-water works: raw-water intake, coagulation, three ultrafiltration skids, UV and chlorine disinfection, clearwell storage and pressure-managed distribution.

The Vaucluse Water Treatment Works process overview in Djinious: raw-water pumps, intake valve, three ultrafiltration skids, UV reactor, chlorine dosing, clearwell and three distribution pumps, with live flows on every line.
The works, drawn once in the Builder and rendered live by the Runner. RWP-02 is red because its vibration is genuinely in the shutdown band.Aqua Rhône · Avignon, France
16
assets modelled
116
live tags at 1 Hz
6
procedure steps
2
assertions checked
EQUIPMENT

What the platform models here

Each family has a behavioural model that the live simulator and the proving twin share, so a dry-run behaves the way the plant does.

  • Centrifugal pumps
  • Ultrafiltration skids
  • UV reactor
  • Dosing skids
  • Clearwell
  • Analyser
  • Blower
  • Control valve
THE STANDING PROBLEM

A fouled membrane skid is a compliance problem, not a maintenance ticket

UF-03 runs at a fouling index of 61 %, holding transmembrane pressure at 1.60 bar — past the 1.35 bar backwash limit. Take it out of service naively and the works loses a third of its treated-water capacity during peak demand. Leave it fouled and permeate turbidity climbs toward the membrane-integrity limit.

THE PROCEDURE

Ultrafiltration Backwash & Load Transfer

uf-backwash-recovery

Recover a fouled ultrafiltration skid without losing treated-water output: take UF-03 off duty and backwash it, transfer its load to UF-01 and UF-02, and confirm with the treatment supervisor before the change is applied.

  1. 01Reduce UF-03 flux → 40 %
  2. 02Backwash UF-03
  3. 03Raise UF-01 flux → 96 %
  4. 04Raise UF-02 flux → 96 %
  5. 05Treatment-supervisor confirmation
  6. 06Notify control room

C4 · operational action

THE PROOF

UF-03 Fouling Excursion

UF-03 enters the shift already fouled and continues to foul while the other two skids run at normal flux.

Assertion results for the UF-03 Fouling Excursion scenario, run without the procedure and with it.
AssertionBaselineWith procedure
UF-03 transmembrane pressure ≤ 1.35 bar1.62 bar0.56 barpass
UF-01 / UF-02 permeate ≥ 340 m³/h each334.9 m³/h365.4 m³/hpass

Baseline fails both assertions. With the procedure, four commands are intercepted on the isolated twin and both hold.

IN THE PRODUCT

What the control room sees

The Djinious operator dashboard scoped to the water works: asset counts, availability, active alarms, a live trend of works output and distribution flows, and the plant status grid by equipment family.
The dashboard adapts to the plant. No generation here, so the KPI row is assets, availability and alarms — and the hero trend is the works' own signals.
The Djinious alarm list showing ISA-18.2 priorities, states and acknowledgement controls.
ISA-18.2 alarm management. UF-03's transmembrane pressure alarm is a real threshold crossing on a real tag.
The authored ultrafiltration backwash procedure rendered as BPMN, with its validation report and capability list.
The procedure as the platform holds it: BPMN, validated, with its required capabilities and authority class.

Run this against water & wastewater you actually operate.

We will model your equipment, wire your tags and dry-run one of your procedures on the call.

DjiniousControl Center

Supervise the plant, author the procedure, prove it on an isolated twin, execute under policy. One governed loop.

  1. Observe
  2. Author
  3. Prove
  4. Act